What are the setback requirements for new waste management systems?

Published 07/06/2016 11:34 AM   |    Updated 07/06/2016 11:34 AM
What are the setback requirements for new waste management systems?

New waste management systems must be located to maintain the minimum setback distances from the following features known and identifiable at the time of application submittal, including:

  1. 1,000 feet from a public water supply well or public water supply surface intake structure
  2. 300 feet for liquid manure storage structures or 100 feet for solid manure storage structures from surface waters of the state, drainage inlets (including water and sediment control basins), sinkholes (measured from the opening or the lowest point) and off-site water wells
  3. 100 feet from on-site water wells, property lines and public roads
   4.   400 feet from existing off-site residential and public buildings
Was this answer helpful?
 
Your rating has been submitted, please tell us how we can make this answer more useful.

Print